Projects
You are here
Projects
02 Apr
Factory for bottling of mineral water. Capacity of bottling (spring) is 8,1 liter/sec. Filling of plastic bottles with water. Volume of plastic bottle is 0.25 – 5.00 liter. Construction of production facilities are completed. It is... more
02 Apr
The "Euro-Island" Project is a tourist structure whose aim is to develop the quality of economic and business environment of the area through tourism activities supported by a natural setting, with huge potential for... more
02 Apr
Objective of the project:
Making the connection of drinking water supply for Craiova International Airport and creating the second source of water supply for Craiova Industrial Park.
The specific objectives:
02 Apr
Objective of the project:
The sewarage connection will allow the replacement of the existing one which has two drawbacks:it is damaged and it crosses private properties..
The specific objectives:
02 Apr
The specific objectives:
This project proposes to complete constructions related to the 4 plots inside Craiova Industrial Park.
02 Apr
General objective:
-Ensuring a modern regional and local transport infrastructure , the development of economy and improve the quality of life
Specific objectives:
02 Apr
General objective:
-Ensuring a modern regional and local transport infrastructure , the development of economy and improve the quality of life
Specific objectives:
Increasing the degree of accessibility of Valcea county... more